Topographical mapping ( 220 ha)
Preparation of Settlement plan(1:1000 scale) (220 ha)
Preparation of detailed settlement plan (1:500 scale) (150 ha)
Design of ring road and internal traffic roads in the Campus (7 kms)
Design of highway connection traffic and pedestrian roads to Campus
Design of sewage system (8 kms)
Design of wastewater treatment plant (30 000 residents)
Design of freshwater supply, storage pumping and distribution network (6 kms)
Design of storm water drainage system to Sapanca lake (5 kms)
Design of underground galleries used for data lines and central heating system (2 kms)
Design of central heating system (1 000 000 m2 heating)
Design of High and Low voltage electric network system.
Design of campus lightening system
Landscape architectural design , pedestreal roads, recreational facilities, parks etc
Design of ring road and internal traffic roads in the Campus (7 kms)
Construction of highway connection traffic and pedestrian roads to Campus
Construction of sewage system (8 kms)
Construction of wastewater treatment plant (30 000 residents)
Construction of freshwater supply , storage pumping and distribution network (6 kms)
Construction of storm water drainage system to Sapanca lake (5 kms)
Construction of underground galleries used for data lines and central heating system (2 kms)
Construction of High and Low voltage electric network system.
Installation of campus lightening system
Construction and installation of Landscape architectural design , pedestrian roads, recreational facilities, parks etc
Plantation of the landscape